Encorp executed demolition works with precision, ensuring each stage is handled efficiently and in alignment with the highest standards of safety and quality.
The demolition and disposal of pebblecrete flooring in balcony areas were conducted with care, effectively removing the existing surface while preserving surrounding common areas and walkways. This selective approach allowed us to focus solely on the designated balcony areas, minimizing disruption and maintaining the integrity of adjacent spaces.
An allowance to grind off any waterproofing beneath the pebblecrete flooring was included to address any underlying layers encountered during demolition. This careful preparation ensures a clean, even surface, ready for the next stages of the project, and upholds the waterproofing standards required for the balconies’ longevity.
In addition, Encorp carried out the demolition and disposal of brick balustrades on each balcony, carefully removing these elements to open up the spaces and prepare them for modernized replacements.
Where required, saw cutting of brick balustrades was performed with precision, allowing for clean, controlled separation that preserves the structural integrity of adjacent areas.
Each aspect of this demolition process was executed with a focus on quality, safety, and readiness for subsequent construction phases, embodying Encorp’s dedication to delivering excellent results at every stage of the project.